Launch Falcon more than 100 times from Florida in 2025
In September 2025 SpaceX said Falcon was on track to exceed 100 launches from Florida alone during 2025. This site has not yet reviewed a primary source recording the final count.
Uncertain
What do the status labels mean?
Announced: it has been said out loud, but we have not seen work toward it yet.
In progress: we can point to tests, hardware or contracts that show work under way.
Partially achieved: part of the job is done and shown, but not all of it.
Achieved: evidence matches the whole “done” description we wrote down.
Uncertain: sources disagree or are missing. We say so instead of guessing.
Paused or cancelled: a reliable source says work has stopped or the plan was dropped.
Full definitions →Stated target window has passed; outcome not yet verified. This is a calculated flag, not a status: the stated window has closed and no evidence of achievement within it has been recorded. It is not a claim that the milestone failed.
- Said on
- 18 September 2025
- First target In plain English
What is a target window?
A target window is when the company said something would happen. Sometimes that is an exact day. Often it is only a month, a quarter or a year.
We keep it exactly as vague or as precise as the company did. If they said “2026”, we show 2026. We never turn that into a made-up day in December.
When a company gives a new date later, we keep the old one too. You can always see how the plan moved.
Saying “I’ll visit this summer” is a window. Saying “I’ll visit on 14 July” is an exact date. They are not the same promise.
- 2025Year precision, stated 18 September 2025
- Current target
- 2025Year precision, stated 18 September 2025
- Last checked In plain English
Who checked this, and how?
Each record has a review note. It names who did the check and lists every claim that was compared with its source.
Right now these checks were done with AI help and have not yet been re-read by an independent human editor. We say this plainly on every page rather than hiding it.
A “review due” label means the record is older than two weeks and is scheduled for another look. The content is unchanged until then.
- 18 September 2026Next review due 2 October 2026
What would count as “done”
A primary source records more than 100 Falcon launches conducted from Florida launch sites during calendar year 2025.
Why we say this
The only source reviewed states an expectation partway through 2025 -- that Falcon was on track to launch more than 100 times from Florida alone that year -- not a final count. No end-of-year figure from SpaceX, the FAA or the Space Force has been checked yet, so this site does not assert either that the target was met or that it was missed.
Stated uncertainty. This record exists to show an unresolved past target honestly. The 2025 window has closed; the absence of a verified outcome here reflects this site's review backlog, not evidence that the target was missed.
How the date moved In plain EnglishWhat is a target window?
A target window is when the company said something would happen. Sometimes that is an exact day. Often it is only a month, a quarter or a year.
We keep it exactly as vague or as precise as the company did. If they said “2026”, we show 2026. We never turn that into a made-up day in December.
When a company gives a new date later, we keep the old one too. You can always see how the plan moved.
Saying “I’ll visit this summer” is a window. Saying “I’ll visit on 14 July” is an exact date. They are not the same promise.
What is a target window?
A target window is when the company said something would happen. Sometimes that is an exact day. Often it is only a month, a quarter or a year.
We keep it exactly as vague or as precise as the company did. If they said “2026”, we show 2026. We never turn that into a made-up day in December.
When a company gives a new date later, we keep the old one too. You can always see how the plan moved.
Saying “I’ll visit this summer” is a window. Saying “I’ll visit on 14 July” is an exact date. They are not the same promise.
- Stated 18 September 2025 · recorded here 18 September 2025 · current target2025 (Year precision)
First and only stated target window.
What actually happened
We have not yet recorded anything that happened towards this promise. That describes our evidence, not the company: things may have happened that we have not written up yet.
Sources In plain EnglishWhere does the evidence come from?
Every status links to the page we read. We record who published it, when, and which part of it supports the claim.
A company saying something proves that the company said it. It does not prove the thing is true. When we can, we look for a second voice: a regulator, a partner like NASA, or an exchange.
If a page disappears later, we flag it. A missing page is not proof that a claim was wrong.
Source rules →
Where does the evidence come from?
Every status links to the page we read. We record who published it, when, and which part of it supports the claim.
A company saying something proves that the company said it. It does not prove the thing is true. When we can, we look for a second voice: a regulator, a partner like NASA, or an exchange.
If a page disappears later, we flag it. A missing page is not proof that a claim was wrong.
Source rules →Who checked this In plain EnglishWho checked this, and how?
Each record has a review note. It names who did the check and lists every claim that was compared with its source.
Right now these checks were done with AI help and have not yet been re-read by an independent human editor. We say this plainly on every page rather than hiding it.
A “review due” label means the record is older than two weeks and is scheduled for another look. The content is unchanged until then.
Who checked this, and how?
Each record has a review note. It names who did the check and lists every claim that was compared with its source.
Right now these checks were done with AI help and have not yet been re-read by an independent human editor. We say this plainly on every page rather than hiding it.
A “review due” label means the record is older than two weeks and is scheduled for another look. The content is unchanged until then.
Claims we compared with their sources
Falcon was on track to launch more than 100 times from Florida alone in 2025.
Supports the stated mid-2025 expectation only. No source establishing the final 2025 count has been checked, so the milestone status is uncertain and no outcome is recorded.
What this check could not tell us
- This is an AI-assisted review, not independent human review. A human editor has not yet re-checked these findings.
- Every source checked in this review is a SpaceX company statement. Company statements establish what the company said; they do not independently establish the outcomes as fact.
- Source pages were read through a browser on 18 September 2026. The accessedAt time on each source is normalised to 12:00 UTC on that date rather than recording an exact retrieval instant.
- The SpaceX updates page is a single URL carrying dated sections. Locators identify the section by date and heading because per-update permalinks were not used.
- No regulator or mission-partner source has been checked for this batch, so no FAA, NASA or filed-document claims are published.